Monday, January 30, 2023
  • РусскийРусский
  • EspañolEspañol
  • Login
  • Register
gofro.expert
  • News
  • Europe
  • Asia
  • Africa
  • Happy Birthday !
  • Subscribe
  • Contacts
  • Advertising
No Result
View All Result
gofro.expert
  • News
  • Europe
  • Asia
  • Africa
  • Happy Birthday !
  • Subscribe
  • Contacts
  • Advertising
No Result
View All Result
gofro.expert
No Result
View All Result

Progroup Starts Another Corrugated Plant in Stryków

11.01.2023
in Company news, Europe, Main, News
A A
3
SHARES
335
VIEWS


Leer en español
Читать на русском

The new high-tech plant with over 28,000 sqm area will produce up to 200,000 tpy of corrugated sheetboard. Together with the existing PW07 plant next door, PW14 will in fact have a production capacity of 825 million sqm per year. This means that Stryków is now one of the world’s biggest sites for corrugated board production. Progroup has invested around 72 million euros in this project, and created 50 new jobs

“We have always aspired to lead the way on technology in the industry. This means we need to test new generations of machinery with partners like BHS and work together to ensure they can operate stably,” says Maximilian Heindl, CEO of Progroup.

The 3.35 m corrugator at the PW14 plant has a production speed of 400 mpm being able produce almost any type of corrugated cardboard.

The heart of the corrugator, the Modul Facer® MF-A concept developed by BHS Corrugated, has been used for the first time anywhere with a working width of 3.35 m at Progroup.

The MF-A concept delivers a highly efficient production process and the finest quality corrugated cardboard, incl. single and double-wall Next Board® with B, C and E flutes in all combinations.

The Next Board® products require much lower use of energy and raw materials and reduce CO2 emissions per tonne of corrugated board by 26% on average, while delivering better strength figures.

The PW14 also features a 32-meter-high, fully automatic high-bay warehouse with more than 14,000 storage spaces and four automatic storage and retrieval machines. It will be able to store up to two days of corrugated sheetboard production, which faciltates just-in-time deliveries.

Progroup PW10 and Gatner Packaging plants in Trzcinica

The Polish packaging manufacturer Gatner Packaging (until December 2022 – Janmar Centrum) has established its plant right next to PW14. The companies have already been cooperating successfully for many years at the Trzcinica site, and now they are doing the same in Stryków too: Progroup sends its corrugated board sheets the short distance to its neighbour, which can then process them directly without any consignments needing to be shipped by truck.

PW14 together with PW07 and the PW10 plant in Trzcinica is Progroup’s third production site in Poland – and the family company’s twelfth corrugated sheetfeeder plant overall. With the new plant Progroup is strengthening its position in the Central and Eastern European markets.

gofro.expert

If you find an error, please highlight a piece of text and clickCtrl+Enter.

Tags: BHSGatnerHeindlJanmarProgroup

Related Posts

Janmar Centrum => Gatner Packaging
Company news

Janmar Centrum => Gatner Packaging

20.12.2022
На 30-летие Progroup основатель передаёт полномочия сыну
Appointments

On Progroup’s 30th Anniversary, Founder Hands Over Management to His Son

09.11.2022
Progroup: ещё 500 млн листа
Company news

Progroup: Another 500M SQM of Corrugated Sheet

04.07.2022
Next Post
Happy Birthday, Andy Wingrove! (Smurfit Kappa Abercarn)

Happy Birthday, Andy Wingrove! (Smurfit Kappa Abercarn)

Happy Birthday, John Dickison! (BOBST)

Happy Birthday, Jack Wu! (Shanghai Yuncheng plate making Co., Ltd)

Гофроагрегат из 1920-х

Corrugator From 1920s

Do you want to receive news? Subscribe!

Popular

Игорь Диденко: “К концу года мощности Новосибирского КБК составят свыше 18 млн кв. м в месяц”

Igor Didenko: “By the End of 2021, Monthly Output of Novosibirsk Paper Mill Will Exceed 18 mil sq. m”

27.04.2021

Interview

Шесть вопросов гендиректору Saica Pack USA

Six Questions to General Manager of Saica Pack USA

08.11.2022

gofro.expert is an online project by Igor Tkalenko featuring everything useful for corrugated board manufactures and processors. News, analytics, technology, video reports from exhibitions and events - everything you need to know about corrugated cardboard in one place. If you have any good news you would like to share or need help promoting your business, go to the professionals. Go to gofro.expert.

Джордж Миллс: “Устранение коробления сродни волшебству”

George Mills: “Sounds almost magic, but it works…”

07.07.2021

“Basically, people that are a lot smarter than me operate these machines”

“Basically, people that are a lot smarter than me operate these machines”

17.08.2022

Subscribe to gofro.expert

Contact Us
Линии EVOL 100 работают со скоростью либо ноль, либо 350

EVOL 100 Inlines Run at Either 0 or 350 bpm

15.02.2021

“5-6 лет назад в Фошане было проблемно найти англоговорящего работника”

“At First It Was Problem to Find English-Speaking Worker in Foshan”

23.06.2022

Yandex.Metrica
No Result
View All Result
  • РусскийРусский
  • EspañolEspañol
  • News
  • Europe
  • Asia
  • Africa
  • Happy Birthday !
  • Subscribe
  • Contacts
  • Advertising
  • Login
  • Sign Up

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
Login
Войти с помощью: 

Войти с помощью: 

Captcha loading...


Register | Lost your password?

Register

Войти с помощью: 

Captcha loading...


A password will be e-mailed to you.

Log in | Lost your password?

Reset Password

Log in| Register

Spelling error report

The following text will be sent to our editors:

Send Cancel